Discover the Invoxia GPS Tracker Pro, a cutting-edge tracking device offering unparalleled location accuracy with LTE-M connectivity and global coverage. Perfect for real-time monitoring anywhere in the US, it provides advanced location tracking even in hard-to-reach areas. Easily set up via the intuitive app, you can view live locations, export histories, and share tracks seamlessly. Stay protected with theft prevention features including suspicious movement alerts and customizable virtual zones that notify you instantly on your smartphone of any unauthorized activity, boosting recovery chances. Enjoy exceptional battery life with up to 6 months of use on a single charge and quick 90-minute refills. Experience reliable, high-performance tracking designed for everyone, ensuring your valuable possessions are secure around the clock.
Buying this product you will collect 20 points with our loyalty program. Your can convert 20 points in your account into a voucher for a future purchase.
GPS PRO Tracker - Real-time Location - 1-Year Subscription Included - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life
The GPS PRO Tracker offers reliable, real-time tracking with a full 1-year subscription included. Designed to discreetly monitor cars, motorcycles, bicycles, children, and more, it features motion and tilt alerts for enhanced security. Operating on the advanced 4G LTE-M network, it provides up to 3 months of battery life on a single charge, helping you keep track of your valuables effortlessly.
Experience peace of mind with the ability to track anything, anywhere, at any time. This high-resolution image showcases the powerful and versatile tracking capabilities available 24/7, ensuring you never lose sight of what matters most.
The GPS PRO Tracker boasts a sleek, discreet design, perfect for hiding in any valuable or vehicle. Trusted by award-winning Invoxia technology, it combines innovation and stealth, offering reliable real-time tracking tailored for your security needs.
With over a decade of expertise in intelligent devices, this GPS Tracker guarantees quality and performance you can rely on. Supported by American customer service, it ensures your possessions and loved ones stay safe. Invoxia’s multi-award-winning design reflects commitment to excellence and innovation.
Control your GPS PRO Tracker effortlessly through the intuitive Invoxia mobile app, available on iOS and Android. Monitor real-time locations, receive alerts, and manage settings all from the convenience of your smartphone.
Real-Time Boost delivers high-frequency updates every 30 seconds, offering precise turn-by-turn tracking when urgency demands it. Perfect for emergencies to swiftly recover your belongings.
Advanced anti-theft alerts and geofencing let you create safe zones and detect suspicious activities instantly, giving you peace of mind and early warnings of potential theft or damage.
Smart Alert and Lost Mode ensure you only receive critical notifications. Leaving your valuables behind triggers automatic alerts and helps you locate misplaced items quickly.
An SOS button offers instant alerts when pressed, making it ideal for elderly parents or children who may need emergency assistance. Additional automations are available via IFTTT integration for customizable safety.
Cars, Trucks, Vans and Other Vehicles
No wiring required. Discreetly place the tracker in gloveboxes, under seats, trunks, or pockets. Monitor your vehicles and those of loved ones anytime, anywhere with total concealment.
Motorcycles, eBikes, Mopeds and Scooters
Protect your two-wheelers with sensitive motion and tilt alerts that notify you instantly of any movement or impact. Enhance recovery chances and keep your bike safe from thieves.
Kids, Seniors and Loved Ones
Compact and easy to hide in bags or pockets, the tracker ensures you know the whereabouts of your loved ones 24/7, offering comfort and security when it matters most.
The Longest Lasting Standalone GPS Tracker
Packed with features for peace of mind
1-year subscription included with embedded SIM card
On-demand Real-Time GPS tracking
Uses GPS, Wi-Fi Positioning, and Bluetooth for up to 10-yard accuracy
Works throughout the Continental U.S.A. and Hawaii
Operates on 4G LTE-M cellular networks
Battery life ranges from 120 hours (in motion) up to 4 months (stationary)
Tiny form factor: 4.1" x 1.1" x 0.4" and lightweight at just 1.05 oz
Includes proximity radar and ringer for indoor and outdoor tracking
Invoxia GPS Mobile App
Track anything from anywhere with a simple and intuitive app available for both iOS and Android smartphones. All you need is your phone to manage and monitor your tracker with ease.
Intelligent Geolocation for Long Battery Life
By intelligently blending GPS, WiFi Positioning, and Bluetooth for accurate indoor and outdoor location updates, the tracker provides exceptional battery performance without compromising on tracking quality.
Battery Life Estimates
Battery duration varies with tracking frequency and how long the device is in motion. For example, continuous tracking during an 8-hour road trip can last about 5 days per charge. Typical commuting tracking provides around 3 weeks, while Bluetooth-enabled phone proximity can extend it up to 4 months.
: B08HM69GS2
: 500 Items
Hurry! only 500 items left in stock.
Use collapsible tabs for more detailed information that will help customers make a purchasing decision.
Ex: Shipping and return policies, size guides, and other common questions.
Paste the label on a flat surface on the package
Make sure that both 1D and 2D barcodes are clearly visible
Ensure that the label is smooth and isn’t creased or wrinkled
Check for any tears, dents, holes or scratches
Pack your product tightly, with the right size packaging
Ensure both barcodes are on a flat surface of the package
Size
S
M
L
XL
Men
7-10
10-13
13-15
15-17
Women
7-9
10-12
13-14
15-16
Example Shown : SIZE XL, Hem to Hem 84cm OR 33 ,SIZE L, Hem to Hem 84cm OR 33 ,SIZE M, Hem to Hem 84cm OR 33 ,SIZE S, Hem to Hem 84cm OR 33
Rated 4.67 on the scale 1 - 5 based on 3 customer reviews
Greg S.
06/02/2025
Long Battery Life and Accurate Tracking
I've been using the Invoxia GPS Pro Tracker for about two months now, and I'm impressed with the battery life. I only have to charge it every few weeks! The tracking is also very accurate, using GPS, Wi-Fi, and Bluetooth. I use it to keep track of my car, and the alerts are helpful for preventing theft. Highly recommend!
Michael T.
06/02/2025
Great for Keeping Tabs on My Teenager
Bought this for my teenage son's backpack. It's small and discreet, and the real-time location tracking is incredibly accurate. I especially like the geofencing feature – I get alerts when he arrives and leaves school. It helps me feel more connected and secure, knowing where he is. The app is easy to use, too!
Julian M.
06/02/2025
Peace of Mind for My Motorcycle
I got this Invoxia GPS PRO Tracker to protect my motorcycle, and it's been fantastic. The motion and tilt alerts are super sensitive, so I get notified immediately if anything seems off. The 4G LTE-M coverage is great, and the battery lasts a surprisingly long time. Knowing I can track it anywhere gives me real peace of mind. Definitely worth the investment!